Furnace for Clay Brick Firing
Price: |
US $ 100000/Piece |
Min Order: |
1/Piece |
Pay Type: |
L/C,T/T,D/P |
Product Specifications
Prod Model: |
Brictec |
Capacity(Bricks/Hr): |
15000-20000 |
Intalled Power(Kw): |
250+2*1.5 |
Extruding Force(MPa): |
4 |
Vacuum Degree(MPa): |
0.092 |
Method: |
Brick Production Line |
Processing: |
Brick Production Line |
Product: |
Brick |
Brick Raw Material: |
Clay |
Automation: |
Automatic |
Tolerance: |
0.5mm |
Certification: |
ISO9001: 2000, ISO 9001:2008, ISO 9001:2000 |
Type: |
Brick Making Line |
Product Description
Furnace for clay brick firingProduct Introlduction:
Tunnel furnace is the lates technolohy for brick making industry. It is equipped with fully automatic equipment and control system. The total kiln can be divided into 3 zones: pre-heating zone, heating zone, cooling zone. The temperature in each zone is different to meet the different needs.
The details are as following: Tunnel kiln meter width | capacity | Equipment of kiln | Production days in a year |
2.5 | 15-20 million pcs annual | Kiln cart, hydraulic ferry pusher, blower, loading machine,etc | 330days |
3.3 | 20-25 million pcs annual | Kiln cart, hydraulic ferry pusher, blower,loading machine,etc | 330days |
3.4 | 20-28 million pcs annual | Kiln cart, hydraulic ferry pusher, blower,loading machine,etc | 330days |
4 | 25-30 million pcs annual | Kiln cart, hydraulic ferry pusher, blower, loading machine,etc | 330days |
4.6 | 25-38 million pcs annual | Kiln cart, hydraulic ferry pusher, blower ,loading machine,etc | 330days |
6.9 | 35-40 million pcs annual | Kiln cart, hydraulic ferry pusher, blower, loading machine,etc | 330days |
Brick making progress introduction
Our projects in Bangladesh
Handover Projects:- Comprehensive Limited, Tangail [Hoffman Kiln-100,000/day]
- New Generation Clay Bricks, Narayongonj [Hoffman Kiln-50,000/day]
- S.B. Auto Bricks Ltd., Chittagong [Hoffman Kiln-50,000/day]
- G.S.A. Auto Bricks Ltd., Rangpur [Hoffman Kiln-50,000/day]
- Conforce Limited, Savar, Dhaka [Tunnel Kiln-50,000/day]
- Banolata Refractory Ltd., Natore [Hoffman Kiln-50,000/day]
- Kanaipur Auto Bricks Ltd., Faridpur [Hoffman Kiln-50,000/day]
- Pachgaon Auto Bricks Ltd. Tangail, [Hoffman Kiln-50,000/day]
- Paiker Auto Bricks Ltd., Bogra [Tunnel Kiln-100,000/day] (Partial Involvement)
- Alif & Co., Sahapur, Boda, Panchagor [Concrete Block & Pavers-12,800 pcs/hour]
On Going Projects:- SAS Building Materials Ltd., Comilla [Fully Automatic Computerized Tunnel Kiln-160,000/day]
- G.A.K Auto Bricks [Fully Automatic Computerized Tunnel Kiln-100,000/day]
- Mamun Green Bricks Limited, Shalikha, Magura [Hoffman Kiln-100,000/day]
- Sarker Auto Bricks Limited, Raigonj, Sirajgonj [Hoffman Kiln-100,000/day]
- Jehaan Auto Bricks Ltd., Modhupur , Tangail [Hoffman Kiln-100,000/day]
- A&A Auto Bricks Ind. Ltd., Sahapur, Boda, Panchagor [Hoffman Kiln-100,000/day]
- Alpha Auto Bricks Limited, Jamalpur Sadar, Jamalpur [Hoffman Kiln-50,000/day]
- SD Ceramics LLP, Assam, India [Tunnel Kiln-100,000/day]
- SD Ceramics LLP, Assam, India [Hoffman Kiln-50,000/day]
Company & Service Introduction
1.We majors in the abroad & home fired-brick designing, kiln designing, factory building designing and turn-key project.
2.We have many professional specialists, among which 6 are professor-level engineer and 10 are of high title.
3.We have accomplished over 50 brick projects of engineering, trading, technical support in Asia, Africa and South American countries.
4.We have also successfully constructed over 20 production lines in China.
Before-sale services:
(1) Tell customer how to build a brick plant, the complete plant including three parts, brick shaping machinery, drying and firing.(Confirm clay,power electricity,water,land area, fund)
(2) Guide customers to choose the best and economic plant, recover the investment within short time.
(3) site inspection
(4) We are responsible for the offer, flow chart, and detail specification of each machinery.
In-Sale services:
(1)Quality control must be inspected strictly
(2)In accordance with the agreements stipulated in the contract
After-sale services:
(1) We will send the technicians to guide with device installation, debugging and training operators until customers are fully satisfied.
(2) Guarantee for machinery, materials and equipment supplied under this quotation are valid for a period of 12 months after commissioning or 16 months after delivery whichever is earlier. Warranty shall cover manufacturing defect in material and workmanship but exclude:
1. Daily wear and tear 2.mishandling or improper operation3. Incoming power supply fluctuation
4. Consumable and spare parts.
(3) Regular visit customer, consult with the customer feedback, come true with the customer's two-way communication.
COMPANY INFORMATIONS:
In the year of 2011 Shandong Mine Machinery Cosmec Construction Materials Machinery Co., Ltd. And Xi'an Brictec Kiln Co., Ltd. Set up the joint venture of Xi'an Brictec Engineering Co., Ltd...Brictec engineering employing the former general manager of European COSMEC PICININI SRL, former chief drying engineer of PICININI, former chief kiln engineer of LAVAZZETTI. They work together with experienced domestic technical and thermal engineers, provide
1) The overall solution for the domestic and international brick factory turnkey project design, undertake and construction;
2) Brick making and automation equipment sales and after-sales service;
3) New brick equipment, new type kiln and new drying technology invention and R&D activities.
We have accomplished over 50 brick projects of engineering, trading, technical support in Asia, Africa and South America. We have also successfully constructed over twenty production lines in China.
OUR SERVICE:
Before-sale services:
(1) Tell customer how to build a brick plant, the complete plant including three parts, brick shaping machinery, drying and firing. (Confirm clay, power electricity, water, land area, fund)
(2) Guide customers to choose the best and economic plant, recover the investment within short time.
(3) site inspection
(4) We are responsible for the offer, flow chart, and detail specification of each machinery.
In-Sale services:
(1)Quality control must be inspected strictly
(2)In accordance with the agreements stipulated in the contract
After-sale services:
(1) We will send the technicians to guide with device installation, debugging and training operators until customers are fully satisfied.
(2) Guarantee for machinery, materials and equipment supplied under this quotation are valid for a period of 12 months after commissioning or 16 months after delivery whichever is earlier. Warranty shall cover manufacturing defect in material and workmanship but exclude:
1. Daily wear and tear 2. Mishandling or improper operation3. Incoming power supply fluctuation
4. Consumable and spare parts.
(3) Regular visit customer, consult with the customer feedback, come true with the customer's two-way communication.