Product Specifications
Prod Model: |
Brictec |
Markets: |
North America,South America,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe |
Material: |
Clay. Mud Soil Shale |
Drying Hours: |
Less Than 30 Hours |
Productivity: |
30, 000, 000~120, 000PCS/Year |
Condition: |
New |
Certification: |
ISO9001: 2000 |
Type: |
Tunnel Kiln for Brick Making Plant |
Product Description
Small tunnel dryer for auto clay brick production line
**Why use the dryer?**
(1)High efficiency: Speed up for green brick drying than the natural air drying;
(2)Energy saving: Waste heat from kiln, it can recover the waste heat from kiln;
(3)No influence because of the bad weather, even in a cold, wet or raining day, continuous operation for green brick;
(4)Saving your area and labor: dryer takes small area and a little labors;
(5)Drying chamber is used together with kiln, It can speed up drying.
**How to choose your dryer?**
There are 3types of dryer :1)Small dryer 2)chamber dryer 3)Tunnel dryer
Dryer type | Brick setting times | Material option | Product standard | Auto-Level | Cost |
Small dryer | Twice setting | Clay ( Esp. for Indian and Bengal ) | Solid brick& cell brick( hole rate≤25%) | Semi-Auto /Auto | Lower |
Chamber dryer | Twice setting | Clay ( Esp. for Indian and Bengal ) | Solid brick& cell brick( hole rate≤35%) | Semi-Auto /Auto | Higher |
Tunnel dryer | Once setting | Shale, etc. Hard material | Solid brick & cell brick( hole rate ≤25%) | Semi-Auto /Auto | Higher |
**The small tunnel dryer for automatic Brick Production Line**
small Tunnel dryer | Capacity | Equipment cost of dryer | Production days in a year |
6 tunnels | 15~20 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
8tunnels | 20~25 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
10 tunnels | 25~30 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
12 tunnels | 30~35 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
14 tunnels | 35~40 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
16tunnels | 40~45 million pcs annual | dryer cart, hydraulic ferry pusher, blower, Three wheel cart, etc | 330 days |
**Packaging & Shipping**
Wooden-packing for spare parts of brick making production line, such as aguers, mixing paddles, air compressor is easy damage, it necessary packed in wooden box. Normally, we ship the goods by MAERSK,MSC,CMA-CGM etc. the big shipping company guarantee goods in safety.
**Our services**
Before sale: Give some advices to customer on how to build a new-brand brick plant and choose the best and economic plant according to the local situation for recovering the investment within a short time; We are also responsible for the offer, flow chart, and detailed information of each machine.
In sale: We will send the technicians to coach brick making machines installation and debug machines. We also train the local operators till they can fully control them.
After sale: Regularly visit customers, solve all the problems with the machine and take advice from customers.
**Company Introduction**
We, Xi'an Brictec Engineering Co. Ltd., not only majors in sale of brick making machines, but also concentrates on the overseas and domestic fired brick designing, kiln designing, factory building designing and turn-key project. Our company provide solutions to brick & tile making industry by a group of professionals who have more than 25 years experience in the brick and tile making process industry. There are 6 professor-level engineers and 10 with an high title.
We cooperates with brick machinery factories to supply customers with the most suitable machines. Until now ,we have accomplished over 50 brick projects of engineering, trading, technical supporting in Asia, Africa, South American countries. We also have successfully constructed over 20 production lines in China.
**FAQ**
1.Q: How many kinds of brick making machinery?
A: In a brick making production line, there are usually 4 processes:
Raw materials preparation, includes: box feeder, primary rolling crusher, fine pulverizing rolling crusher and etc.
Molding process, includes: extruder, brick cutter and etc.
Drying process, includes: drying cars, operation equipment.
Firing process, includes: kiln cars, operation equipment, fans and etc.
2. Q: Raw materials for making bricks?
A: Clay, shale, coal gangue, construction waste, city waste, fly ash and etc.
3. Q: What do I need to prepare before building a brick factory?
A: Land investigation, investment budget, water and electricity, government licenses, find a qualified supplier, make contract, initial design and etc. There can be a lot to prepare, but with the help of BRICTEC, you can get clear guidance and one-stop service the whole time.
4. Q: Does your company undertake turn-key projects?
A: Yes, we have turn-key projects in many countries, such as Russia, Kazakhstan, India, Iran, Bangladesh and so on